Search fhwa.dot.gov

Case Studies

This database includes both Case Studies that have been described in official publications and Projects that have been posted here by contextsensitivesolutions.org site members . To search for a particular project, enter a keyword or click on "Advanced Search."


     Projects      Case Studies

1 2 3 4 5 6 7 8 9 10 > >>
Sort by:    Sort Up Icon Title    Status    State   
Courtesy of DDOT

11th Street Bridges Project

Washington, DC (Started 2008-07-02)

The incomplete freeway system in Southeast Washington forces drivers to exit the freeway onto neighborhood streets to reach their destinations. Some of the primary routes are through environmental justice neighborhoods. Freeway and local street... more

The purpose of this project was to reconstruct a six-mile section of urban arterial to address capacity and safety issues, in addition to providing a stimulation to the local economy.

12300 South Design Build Project, Draper and Riverton, Utah

Draper, UT

The purpose of this project was to reconstruct a six-mile section of urban arterial to address capacity and safety issues, in addition to providing a stimulation to the local economy.

21st Street Complete Green Street Concept Plan

Paso Robles, CA

21st Street is a commercial and residential street near the Paso Robles Event Center, home of the California Mid-State Fair. The street, one of four railroad crossings in town, was established decades ago in a natural drainageway. A concept plan... more

28th - 31st Avenue Connector Builds Bridges in Nashville

Nashville, TN

For several decades, Interstate 40 and a CSX railroad line separated North Nashville from West End and limited social and economic interaction between those communities. The recently completed 28th-31st Avenue Connector spans the railroad tracks... more

options5-6

3500 South EIS, Redwood Road to 8400 West

(Started 2002-03, Completed 2007)

Purpose and Need Problems and needs identified by the entire project team, including community are best seen on the attached pdf.

The Purpose and Need statement was developed through a collaborative effort between local... more

6th Street Undercrossing

Santa Rosa, CA (Completed 2012)

This project creates a vital crosstown link for pedestrians, bicyclists, and vehicles. On one side, it opens up into the West End Neighborhood, Railroad Square, the CHOPS Teen Center, the future SMART station, and miles of creek trails. On the... more

Access Management Plan: US Highway 10

Detroit Lakes, MN (Completed 2002)

The Access Management Plan for Highway 10 through Detroit Lakes was needed to improve safety and maintain mobility for through traffic while providing appropriate access to the local community.

This project is located in the City of... more

Added Capacity and Noise Walls - SR-527

Added Capacity and Noise Walls - SR-527

Mill Creek, WA (Started 1990)

This project was developed to address congestion on a section of SR-527 between 164th Street SE and 132nd Street SE. SR 527 highway passes through downtown Mill Creek.

Aesthetic and Safety Improvement, SR-99

Aesthetic and Safety Improvement, SR-99

Des Moines, WA (Started 1997, Completed 2005)

The purpose of the project is to improve traffic congestion, operations, and safety; provide facilities for transit and pedestrians; and encourage economic redevelopment along the SR-99 corridor through the city of Des Moines.

Aesthetic Guardrail Design, SR-20 - Ducken Road to Rosario

Aesthetic Guardrail Design, SR-20 - Ducken Road to Rosario

(Started 2000, Completed 2007)

The purpose of this project is to improve safety and reduce accident frequency and severity. Within this section of SR-20, a primary issue is upgrading it to bike touring standards.

AR 215, Ozark National Forest, AR

AR 215, Ozark National Forest, AR

Purpose and Need: Inadequate roadway for current and anticipated traffic - travel lane too narrow, surface rough (gravel), and unnecessary amount of dust and siltation produced, detracting from the personal experience and water quality of the streams... more

Arterial Relations: Widening a one-mile stretch of Pennsylvania roadway far from routine

Altoona, PA

The widening of a one-mile stretch of Park Avenue roadway near Altoona, Pa., was far from routine. The nine-year project impacted more than 80 properties – businesses and residences – resulted in more than 35 right-of-way acquisitions and... more

Earning rave reviews from the City of Shoreline and the public, the project garnered formal recognition from the American Road & Transportation Builders Association (ARTBA) with its Globe Award, which honors U.S. transportation construction projects that demonstrate environmental excellence and stewardship and serve as role models for other projects.

Aurora Multimodal and Interurban Bridge Project

Shoreline, WA (Started 2007-06)

Community desires to improve the quality of life in the city; promote development; security; stormwater quality; aesthetics.

Barracks Row

Barracks Row

Washington, DC (Started 2000, Completed 2004-01)

8th Street Barracks Row, a 3/4 mile, 6 block stretch between Pennsylvania Avenue and M Street SE, is one of the District's oldest commercial corridors. 8th Street's turn of the century buildings give the street charm and character, but over the... more

Bell Street Model

Bell Street Park

Seattle, WA

A single-purpose right-of-way is being transformed into a vibrant, safe, and green public space. This 4-block section is the first phase of a long-range plan for a park corridor stretching from South Lake Union to Elliott Bay. When high land... more

The existing facility had a narrow roadway that posed safety issues and mobility issues due to limited passing opportunities on the winding, mountainous road.

Berthoud Pass Mountain Access Project - Phases 1 and 2

Clear Creek County, CO

The existing facility had a narrow roadway that posed safety issues and mobility issues due to limited passing opportunities on the winding, mountainous road. The existing roadway also posed numerous environmental problems due to: 1) poor... more

Bicycle Facilities: Bellevue, WA

Bicycle Facilities: Bellevue, WA

Bellevue, WA

Bicycle lanes on a four-lane road with a diverter near transit stops. Bellevue has numerous bike lanes on many or most principal roads and many wetland and other trails.

Bicycle Facilities Davis, CA

Bicycle Facilities Davis, CA

Davis, CA

Two-way bicycle lane on a commercial street separated by a planted buffer from both the road and the sidewalk. Davis, CA and its university campus are considered by many to be among the "bicycle champions" because of their extensive bike... more

Bicycle Facilities Ft Lauderdale, FL

Bicycle Facilities Ft Lauderdale, FL

Ft Lauderdale, FL (Started 2003)

Bicycles share the road in Ft. Lauderdale, which has an extensive network of bicycle lanes on local and state routes.

Bicycle Facilities in Olympia, WA

Olympia, WA

Bicycle lane on a four-lane road with a diverter and a mid-block crosswalk. Olympia has a number of bicycle lanes, traffic calming sensitive adaptations, bridges, and trails.

1 2 3 4 5 6 7 8 9 10 > >>


Feedback, questions, comments, or problems?
email info@contextsensitivesolutions.org

Copyright © 2005 Context Sensitive Solutions.org. All rights reserved.
About Us | Site Map | Privacy Policy

United States Department of Transportation - logo
Privacy Policy | Freedom of Information Act (FOIA) | Accessibility | Web Policies & Notices | No Fear Act | Report Waste, Fraud and Abuse | U.S. DOT Home |
USA.gov | WhiteHouse.gov

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000