Courtesy of DDOT

11th Street Bridges Project

Washington, DC (Started 2008-07-02)

The incomplete freeway system in Southeast Washington forces drivers to exit the freeway onto neighborhood streets to reach their destinations. Some of the primary routes are through environmental justice neighborhoods. Freeway and local street... more

28th - 31st Avenue Connector Builds Bridges in Nashville

Nashville, TN

For several decades, Interstate 40 and a CSX railroad line separated North Nashville from West End and limited social and economic interaction between those communities. The recently completed 28th-31st Avenue Connector spans the railroad tracks... more

options5-6

3500 South EIS, Redwood Road to 8400 West

(Started 2002-03, Completed 2007)

Purpose and Need Problems and needs identified by the entire project team, including community are best seen on the attached pdf.

The Purpose and Need statement was developed through a collaborative effort between local... more

6th Street Undercrossing

Santa Rosa, CA (Completed 2012)

This project creates a vital crosstown link for pedestrians, bicyclists, and vehicles. On one side, it opens up into the West End Neighborhood, Railroad Square, the CHOPS Teen Center, the future SMART station, and miles of creek trails. On the... more

I-465 Concept Hierarchy

Accelerate I-465

Indianapolis, IN

For reasons of increasing capacity and improving safety, the I-465 project, titled “Accelerate 465,” consists of freeway reconstruction, upgrades of interchange ramps and mainline capabilities, improved geometrics and access upgrades to major... more

Access Management Plan: US Highway 10

Detroit Lakes, MN (Completed 2002)

The Access Management Plan for Highway 10 through Detroit Lakes was needed to improve safety and maintain mobility for through traffic while providing appropriate access to the local community.

This project is located in the City of... more

AR 215, Ozark National Forest, AR

AR 215, Ozark National Forest, AR

Purpose and Need: Inadequate roadway for current and anticipated traffic - travel lane too narrow, surface rough (gravel), and unnecessary amount of dust and siltation produced, detracting from the personal experience and water quality of the streams... more

Arterial Relations: Widening a one-mile stretch of Pennsylvania roadway far from routine

Altoona, PA

The widening of a one-mile stretch of Park Avenue roadway near Altoona, Pa., was far from routine. The nine-year project impacted more than 80 properties – businesses and residences – resulted in more than 35 right-of-way acquisitions and... more

Earning rave reviews from the City of Shoreline and the public, the project garnered formal recognition from the American Road & Transportation Builders Association (ARTBA) with its Globe Award, which honors U.S. transportation construction projects that demonstrate environmental excellence and stewardship and serve as role models for other projects.

Aurora Multimodal and Interurban Bridge Project

Shoreline, WA (Started 2007-06)

Community desires to improve the quality of life in the city; promote development; security; stormwater quality; aesthetics.

Barracks Row

Barracks Row

Washington, DC (Started 2000, Completed 2004-01)

8th Street Barracks Row, a 3/4 mile, 6 block stretch between Pennsylvania Avenue and M Street SE, is one of the District's oldest commercial corridors. 8th Street's turn of the century buildings give the street charm and character, but over the... more

The existing facility had a narrow roadway that posed safety issues and mobility issues due to limited passing opportunities on the winding, mountainous road.

Berthoud Pass Mountain Access Project - Phases 1 and 2

Clear Creek County, CO

The existing facility had a narrow roadway that posed safety issues and mobility issues due to limited passing opportunities on the winding, mountainous road. The existing roadway also posed numerous environmental problems due to: 1) poor... more

Big Bear Plan

Big Bear Bridge

Big Bear, CA

Time, heavy use and severe weather has critically affected the road and the dam beneath it. Seismic retrofitting of the dam will require the elimination of the existing road, which has two 10.5' lanes with 0' shoulders and a 3.5' sidewalk which... more

r1

Blue Ridge Road Grade-Separation Project

Raleigh, NC (Started 2011)

The proposed Blue Ridge Road grade-separation project in west Raleigh will lower the grade of Blue Ridge Road, carrying it under (currently intersecting) Hillsborough Street and Beryl Drive, as well as a busy at-grade railroad crossing between the... more

Bridgeport Way - University Place, Washington

Bridgeport Way - University Place, Washington

University Place, WA (Started 1998-05, Completed 2002-06)

Bridgeport Way is a major urban arterial and it could be considered as a "Main Street" of University Place. The project involved reconstruction of an existing five-lane road into a four-lane divided roadway over a distance of approximately 1.5... more

Bruce R.Watkins Drive

Kansas City, MO (Completed 2001)

Bruce R. Watkins Drive, a Missouri Department of Transportation project, is a 10.2 mile-long artery, which links downtown Kansas City to Southtown. The design and construction of this project included aesthetic design with environmental... more

Burlington, Iowa: Revitalizing a Struggling Small Downtown

Burlington, IA (Started 1999, Completed 2006)

Burlington, Iowa, was a significant Midwestern river and rail transportation hub from the 1820s til the mid-twentieth century. Manufacturing remains an important component of the local economy, but sprawling suburban development has made it... more

Canal Parkway, from Wiley Ford Bridge to MD 51

Canal Parkway, from Wiley Ford Bridge to MD 51

Cumberland, MD (Started 1989, Completed 2001)

Prior to this roadway project, severe traffic congestion occurred daily at the Virginia Avenue underpass (locally known as the "subway") of CSXT tracks and its intersection with MD 51. When this facility was blocked (by accidents or flooding) there... more

This worn path across several vacant lots is now McVay Street.

Charlotte's Urban Street Design Guidelines

Charlotte, NC

The USDG is one of a set of policies (including the Centers, Corridors, & Wedges Growth Framework and the Transportation Action Plan) intended to transform Charlotte into a more sustainable city and create more context-sensitive streets. First, the... more

Coachella Valley Vista Point 3

Coachella Valley Vista Point

Coachella, CA (Completed 2011-06-30)

This project originally started due to a need to upgrade the existing site amenities of the existing vista point facility to comply with the Americans with Disabilities Act (ADA) and reduce maintenance expenditures. Caltrans maintenance identified... more

Community and Transportation Linkage Planning Program

Albany, NY

The Capital District Transportation Committee (CDTC) is the Metropolitan Planning Organization (MPO) for New York's Capital Region (Albany, NY). CDTC initiated the Community and Transportation Linkage Planning Program (the Linkage Program) in 2000... more

1 2 3 4 5 6 7 8 >


Feedback, questions, comments, or problems?
email info@contextsensitivesolutions.org

Copyright © 2005 Context Sensitive Solutions.org. All rights reserved.
About Us | Site Map | Privacy Policy

United States Department of Transportation - logo
Privacy Policy | Freedom of Information Act (FOIA) | Accessibility | Web Policies & Notices | No Fear Act | Report Waste, Fraud and Abuse | U.S. DOT Home |
USA.gov | WhiteHouse.gov

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000