Search fhwa.dot.gov

Case Studies

This database includes both Case Studies that have been described in official publications and Projects that have been posted here by contextsensitivesolutions.org site members . To search for a particular project, enter a keyword or click on "Advanced Search."


     Projects      Case Studies

1 2 3 >
Sort by:    Sort Up Icon Title    Status    State   
Courtesy of DDOT

11th Street Bridges Project

Washington, DC (Started 2008-07-02)

The incomplete freeway system in Southeast Washington forces drivers to exit the freeway onto neighborhood streets to reach their destinations. Some of the primary routes are through environmental justice neighborhoods. Freeway and local street... more

The purpose of this project was to reconstruct a six-mile section of urban arterial to address capacity and safety issues, in addition to providing a stimulation to the local economy.

12300 South Design Build Project, Draper and Riverton, Utah

Draper, UT

The purpose of this project was to reconstruct a six-mile section of urban arterial to address capacity and safety issues, in addition to providing a stimulation to the local economy.

28th - 31st Avenue Connector Builds Bridges in Nashville

Nashville, TN

For several decades, Interstate 40 and a CSX railroad line separated North Nashville from West End and limited social and economic interaction between those communities. The recently completed 28th-31st Avenue Connector spans the railroad tracks... more

Access Management Plan: US Highway 10

Detroit Lakes, MN (Completed 2002)

The Access Management Plan for Highway 10 through Detroit Lakes was needed to improve safety and maintain mobility for through traffic while providing appropriate access to the local community.

This project is located in the City of... more

Big Bear Plan

Big Bear Bridge

Big Bear, CA

Time, heavy use and severe weather has critically affected the road and the dam beneath it. Seismic retrofitting of the dam will require the elimination of the existing road, which has two 10.5' lanes with 0' shoulders and a 3.5' sidewalk which... more

The goal of the project is to develop Bridgeport Way as a corridor that will improve traffic safety, increase the mobility and cohesiveness of the community, enhance the appearance of the corridor, and control traffic growth.

Bridgeport Way Reconstruction

University Place, WA

The purpose of this project was to address the safety concerns due to the high number of crashes over the past years. At the same time it was viewed essential to the vision statement of the City Council that aimed in improving the quality of life in... more

Bridge Retrofits, I-70 North

St. Louis, MO (Started 2001, Completed 2002)

MoDOT had recently completed 10 miles of urban I-70 interstate using a standard design palette that neighboring residents disliked. Particularly when compared to recent context sensitive solutions development and community input in the adjacent... more

California: Developing and implementing Corridor Master Plans (CMPs)

Two one-day workshops focusing on how CMPs can be used to implement CSS principles to solve transportation & community issues and the mechanics of their funding and implementation in Caltrans. Included a Caltrans project case study, interactive group... more

The purpose of the project was to replace two existing functionally obsolete truss bridges crossing the Cooper River in Charleston Harbor.

Cooper River Bridge Replacement Project

Charleston Harbor, SC

The purpose of the project was to replace two existing functionally obsolete truss bridges crossing the Cooper River in Charleston Harbor. The new structure would need to 1) Increase the capacity of US 17 over the Cooper River, 2) Improved traffic... more

Corridor Management Plan: Minnesota Highway 38 Edge of the Wilderness National Scenic Byway

Grand Rapids, MN (Completed 1995)

The purpose of creating a Corridor Management Plan was to coordinate the philosophies and activities of land management agencies with those of the state and county authorities responsible for planning, designing, constructing, and maintaining a... more

9-3-09 Image

Dana to Downtown

Redding, CA (Completed 2010-08)

State Route 44 through Redding serves as a primary east/west connector for both local and interregional travelers. This segment of freeway crosses the Sacramento River and serves as a gateway and first impression for those entering the downtown... more

Design for Reconstruction of US 93: Evaro to Polson, Montana

Evaro, MT

US 93 runs from Arizona to Canada. It is a two-lane road through much of Montana, entering big-sky country from Idaho at Lost Trail pass and passing through Missoula, Kalispell, the Flathead Indian Reservation, and along the western shore of Flathead... more

Designing Walkable Urban Thoroughfares: A Context Sensitive Approach

(Completed 2010-03)

A need to advance the practice of context sensitive design for major urban streets, drawing on principles and techniques used by practitioners from the new urbanist and smart growth movements. The intent of this joint project was to encourage street... more

El Camino

In recognition of the Spanish migration from the Atlantic coast to the present U.S. Mexico border, each state has designated the roadways the compromise the route as the El Camino East/West Corridor in order to promote tourism and historic... more

FLORIDA Adapts Existing Performance Measures to Reflect CSS

Three half-day sessions for different audiences: a presentation of recent research on quantifying the benefits of CSS, an interactive workshop to apply performance measures to an FDOT CSS project, and an action planning session. Also prepared... more

Ribbon Cutting

Frederick MARC Station and Extension of East Street

Frederick, MD (Completed 2001-01)

The project involved two phases. First, the designers prepared a pedestrian circulation study for the City of Frederick describing existing movement patterns and potential pedestrian routes once the station was complete. Plans were then developed for... more

Hawaii

Hawaii Incorporates CSS Principles and Activities Into Requests for Proposals (RFP) For Consultants

Collection of RFP and proposal evaluation criteria for eight CSS projects from other state DOTs, representing a range of project sizes and scopes.

Houghton Streetscape and Brick Street Re-Installation

Houghton, MI (Started 2007, Completed 2009)

The Michigan Department of Transportation (MDOT) Ishpeming Transportation Service Center (TSC) and its partners took an innovative approach on the US-41 Houghton, Michigan, downtown streetscape project by, among other things, actually drawing... more

Connecting Dallas Timeline

IH-30 East Gateway

Dallas, TX

Over fifty years ago, Fair Park, portions of Deep Ellum, and adjacent neighborhoods were separated from the rest of the city by the construction of Interstate 30. While the highway provided much-needed mobility and helped suburban development, there... more

Illinois

Illinois Linking CSS and NEPA Processes

Two one-day workshops focused on getting resource agencies involved early in the project development process. Included a presentation by MaineDOT, two IDOT project case studies, and interactive group discussion on how IDOT might improve their... more

1 2 3 >


Feedback, questions, comments, or problems?
email info@contextsensitivesolutions.org

Copyright © 2005 Context Sensitive Solutions.org. All rights reserved.
About Us | Site Map | Privacy Policy

United States Department of Transportation - logo
Privacy Policy | Freedom of Information Act (FOIA) | Accessibility | Web Policies & Notices | No Fear Act | Report Waste, Fraud and Abuse | U.S. DOT Home |
USA.gov | WhiteHouse.gov

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000