Search fhwa.dot.gov

Case Studies

This database includes both Case Studies that have been described in official publications and Projects that have been posted here by contextsensitivesolutions.org site members . To search for a particular project, enter a keyword or click on "Advanced Search."


     Projects      Case Studies

1 2 3 >
Sort by:    Sort Up Icon Title    Status    State   

6th Street Undercrossing

Santa Rosa, CA (Completed 2012)

This project creates a vital crosstown link for pedestrians, bicyclists, and vehicles. On one side, it opens up into the West End Neighborhood, Railroad Square, the CHOPS Teen Center, the future SMART station, and miles of creek trails. On the... more

Access Management Plan: US Highway 10

Detroit Lakes, MN (Completed 2002)

The Access Management Plan for Highway 10 through Detroit Lakes was needed to improve safety and maintain mobility for through traffic while providing appropriate access to the local community.

This project is located in the City of... more

Big Bear Plan

Big Bear Bridge

Big Bear, CA

Time, heavy use and severe weather has critically affected the road and the dam beneath it. Seismic retrofitting of the dam will require the elimination of the existing road, which has two 10.5' lanes with 0' shoulders and a 3.5' sidewalk which... more

California: Developing and implementing Corridor Master Plans (CMPs)

Two one-day workshops focusing on how CMPs can be used to implement CSS principles to solve transportation & community issues and the mechanics of their funding and implementation in Caltrans. Included a Caltrans project case study, interactive group... more

Corridor Management Plan: Minnesota Highway 38 Edge of the Wilderness National Scenic Byway

Grand Rapids, MN (Completed 1995)

The purpose of creating a Corridor Management Plan was to coordinate the philosophies and activities of land management agencies with those of the state and county authorities responsible for planning, designing, constructing, and maintaining a... more

Cunningham Avenue Imagery

Cunningham Avenue Beautification

Urbana, IL

The majority of the existing corridor was developed in the County and was later annexed in the City. This created areas of non-conformity with the City's zoning and subdivision ordinances and a significant number of curb cuts along Cunningham... more

Design for Reconstruction of US 93: Evaro to Polson, Montana

Evaro, MT

US 93 runs from Arizona to Canada. It is a two-lane road through much of Montana, entering big-sky country from Idaho at Lost Trail pass and passing through Missoula, Kalispell, the Flathead Indian Reservation, and along the western shore of Flathead... more

The $200 million plus project offers the third transit system alternative in the region that will give customers faster, frequent and first class service.

Euclid Corridor Transportation Project

Cleveland, OH

The Greater Cleveland Regional Transit Authority (GCRTA) is embarking upon a unique and exciting transit system improvement project. The $200 million plus project offers the third transit system alternative in the region that will give customers... more

Feasibility Study, Maine Route 1

Bath, ME (Completed 2005)

Public Engagement

A key component of the Bath Feasibility Study was public involvement. The outreach program included several public forums including a public goal-setting workshop, a public informational meeting and... more

FLORIDA Adapts Existing Performance Measures to Reflect CSS

Three half-day sessions for different audiences: a presentation of recent research on quantifying the benefits of CSS, an interactive workshop to apply performance measures to an FDOT CSS project, and an action planning session. Also prepared... more

The existing Four Bears Bridge (ND 23) was narrow and could not accommodate existing traffic (functionally obsolete).

Four Bears Bridge Replacement

Four Bears Village, ND

The existing Four Bears Bridge (ND 23) was narrow and could not accommodate existing traffic (functionally obsolete). The new Four Bears Bridge provided a modern bridge that eliminated restrictions posed by the earlier bridge. It also accommodated... more

Ribbon Cutting

Frederick MARC Station and Extension of East Street

Frederick, MD (Completed 2001-01)

The project involved two phases. First, the designers prepared a pedestrian circulation study for the City of Frederick describing existing movement patterns and potential pedestrian routes once the station was complete. Plans were then developed for... more

Green Ribbon Project

Houston, TX (Started 1997, Completed 2001)

The purpose of the Green Ribbon Project was to provide the Texas Department of Transportation (TxDOT) with conceptual guidelines to integrate environmental aesthetics with roadway functionality. This project was intended to set forth a broad... more

Hawaii

Hawaii Incorporates CSS Principles and Activities Into Requests for Proposals (RFP) For Consultants

Collection of RFP and proposal evaluation criteria for eight CSS projects from other state DOTs, representing a range of project sizes and scopes.

Hayden, Colorado: Community Visioning Using 3D Scenario Planning Tools

Hayden, CO (Started 2004)

This case study examines ways to efficiently and quickly determine community preferences for balancing new growth and development in a small mountain town. Hayden is a rural town of 1,700 in the Yampa Valley of Colorado, 25 miles down State... more

Before After

Henderson Interstate 215/515 Interchange

Henderson, NV (Started 2005-01-02)

One of the biggest issues facing Nevada DOT is explosive growth rates in the Las Vegas Valley. This growth, along with the accompanying industries and businesses, overwhelmed the highway system's capacity. Part of the solution included building ... more

Houghton Streetscape and Brick Street Re-Installation

Houghton, MI (Started 2007, Completed 2009)

The Michigan Department of Transportation (MDOT) Ishpeming Transportation Service Center (TSC) and its partners took an innovative approach on the US-41 Houghton, Michigan, downtown streetscape project by, among other things, actually drawing... more

I-405 Corridor Program

(Completed 2005)

It is the intent of the Washington Department of Transportation (WSDOT) to integrate community values into the design of the I-405 Design/Build Project. As a consultant to WSDOT, HNTB is accomplishing this important goal by fully employing the... more

I-96 BL (Grand River Avenue) Roadway Rehabilitation

Howell, MI

The project location was I-96BL (Grand River) from M-59 to Grand Oaks Drive in Genoa, Oceola, and Howell Townships and the City of Howell, Livingston County.

The project involved a milling and resurfacing, construction of a center... more

Replace a deteriorating historic bridge quickly reaching its intended lifespan (1939 was the last structural improvement) located in a unique setting that includes a nearby historic hotel and scenic river front area.

IA, Hwy 1, Keosauqua Bridge

Keosauqua, IA

Replace a deteriorating historic bridge quickly reaching its intended lifespan (1939 was the last structural improvement) located in a unique setting that includes a nearby historic hotel and scenic river front area.

1 2 3 >


Feedback, questions, comments, or problems?
email info@contextsensitivesolutions.org

Copyright © 2005 Context Sensitive Solutions.org. All rights reserved.
About Us | Site Map | Privacy Policy

United States Department of Transportation - logo
Privacy Policy | Freedom of Information Act (FOIA) | Accessibility | Web Policies & Notices | No Fear Act | Report Waste, Fraud and Abuse | U.S. DOT Home |
USA.gov | WhiteHouse.gov

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000