11th Street Bridges Project

Washington, DC (Started 2008-07-02)

The incomplete freeway system in Southeast Washington forces drivers to exit the freeway onto neighborhood streets to reach their destinations. Some of the primary routes are through environmental justice neighborhoods. Freeway and local street... more

28th - 31st Avenue Connector Builds Bridges in Nashville

Nashville, TN

For several decades, Interstate 40 and a CSX railroad line separated North Nashville from West End and limited social and economic interaction between those communities. The recently completed 28th-31st Avenue Connector spans the railroad tracks... more

6th Street Undercrossing

Santa Rosa, CA (Completed 2012)

This project creates a vital crosstown link for pedestrians, bicyclists, and vehicles. On one side, it opens up into the West End Neighborhood, Railroad Square, the CHOPS Teen Center, the future SMART station, and miles of creek trails. On the... more

Access Management Plan: US Highway 10

Detroit Lakes, MN (Completed 2002)

The Access Management Plan for Highway 10 through Detroit Lakes was needed to improve safety and maintain mobility for through traffic while providing appropriate access to the local community.

This project is located in the City of... more

Earning rave reviews from the City of Shoreline and the public, the project garnered formal recognition from the American Road & Transportation Builders Association (ARTBA) with its Globe Award, which honors U.S. transportation construction projects that demonstrate environmental excellence and stewardship and serve as role models for other projects.

Aurora Multimodal and Interurban Bridge Project

Shoreline, WA (Started 2007-06)

Community desires to improve the quality of life in the city; promote development; security; stormwater quality; aesthetics.

Austin Accessibility Assessment Improvement (AAAIM)

Austin, TX

Persons with disabilities have long voiced concerns about the lack of integrated access between Capital Metro's (CMTA) fixed-route bus stops and the City of Austin's transportation network, particularly the pedestrian infrastructure, a disconnect... more

Big Bear Plan

Big Bear Bridge

Big Bear, CA

Time, heavy use and severe weather has critically affected the road and the dam beneath it. Seismic retrofitting of the dam will require the elimination of the existing road, which has two 10.5' lanes with 0' shoulders and a 3.5' sidewalk which... more

Bridge Retrofits, I-70 North

St. Louis, MO (Started 2001, Completed 2002)

MoDOT had recently completed 10 miles of urban I-70 interstate using a standard design palette that neighboring residents disliked. Particularly when compared to recent context sensitive solutions development and community input in the adjacent... more

Bruce R.Watkins Drive

Kansas City, MO (Completed 2001)

Bruce R. Watkins Drive, a Missouri Department of Transportation project, is a 10.2 mile-long artery, which links downtown Kansas City to Southtown. The design and construction of this project included aesthetic design with environmental... more

California: Developing and implementing Corridor Master Plans (CMPs)

Two one-day workshops focusing on how CMPs can be used to implement CSS principles to solve transportation & community issues and the mechanics of their funding and implementation in Caltrans. Included a Caltrans project case study, interactive group... more

Churton Downtown

Hillsborough, NC

The following charge was given to responding correspondents for the downtown study: A Downtown Traffic Demand Management and efficiency assessment to include looking at signalization (timing, synchronization and dedicated left turns), turn... more

Coachella Valley Vista Point 3

Coachella Valley Vista Point

Coachella, CA (Completed 2011-06-30)

This project originally started due to a need to upgrade the existing site amenities of the existing vista point facility to comply with the Americans with Disabilities Act (ADA) and reduce maintenance expenditures. Caltrans maintenance identified... more

The purpose of this project was to address safety and capacity issues, with improved geometrics. Environmental and cultural enhancements were also included in the project.

Cody-Yellowstone Highway Project, Wyoming

Cody, WY

The purpose of this project was to address safety and capacity issues, with improved geometrics. Environmental and cultural enhancements were also included in the project.

Context Sensitive Design Resolves Interchange Problems

Queens, NY (Completed 2005)

Already heavily traveled, the corridors were becoming increasingly congested. Volumes on the Cross Island were at 120,000 and on the LIE were approaching 200,000 vehicles a day. These volumes were projected to grow with added lanes to the east in... more

The purpose of the project was to replace two existing functionally obsolete truss bridges crossing the Cooper River in Charleston Harbor.

Cooper River Bridge Replacement Project

Charleston Harbor, SC

The purpose of the project was to replace two existing functionally obsolete truss bridges crossing the Cooper River in Charleston Harbor. The new structure would need to 1) Increase the capacity of US 17 over the Cooper River, 2) Improved traffic... more

Corridor Alignment Urban Design and Community Outreach Services Pasadena Blue Line LRT

Pasadena, CA (Started 2005)

The new 13.6-mile extension of the Blue Line will run from Union Station in downtown Los Angeles into Pasadena, serving the communities of Chinatown, Highland Park, and South Pasadena along the way.

The Pasadena Blue Line is a light... more

Corridor Management Plan: Minnesota Highway 38 Edge of the Wilderness National Scenic Byway

Grand Rapids, MN (Completed 1995)

The purpose of creating a Corridor Management Plan was to coordinate the philosophies and activities of land management agencies with those of the state and county authorities responsible for planning, designing, constructing, and maintaining a... more

Cunningham Avenue Imagery

Cunningham Avenue Beautification

Urbana, IL

The majority of the existing corridor was developed in the County and was later annexed in the City. This created areas of non-conformity with the City's zoning and subdivision ordinances and a significant number of curb cuts along Cunningham... more

Design for Reconstruction of US 93: Evaro to Polson, Montana

Evaro, MT

US 93 runs from Arizona to Canada. It is a two-lane road through much of Montana, entering big-sky country from Idaho at Lost Trail pass and passing through Missoula, Kalispell, the Flathead Indian Reservation, and along the western shore of Flathead... more

Through innovative and collaborative partnerships, 19 political jurisdictions have agreed to pursue a balanced transportation plan that encompasses highway, bus, rail transit, bike, pedestrian and local network projects

Eastern Corridor

Southwestern, OH

The Eastern Corridor Project was conducted to address the growing needs of the eastern Cincinnati metropolitan area by integrating multi-modal solutions, land use planning and environmental stewardship. Through innovative and collaborative... more

1 2 3 4 5 6 7 >


Feedback, questions, comments, or problems?
email info@contextsensitivesolutions.org

Copyright © 2005 Context Sensitive Solutions.org. All rights reserved.
About Us | Site Map | Privacy Policy

United States Department of Transportation - logo
Privacy Policy | Freedom of Information Act (FOIA) | Accessibility | Web Policies & Notices | No Fear Act | Report Waste, Fraud and Abuse | U.S. DOT Home |
USA.gov | WhiteHouse.gov

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000