This database includes both Case Studies that have been described in official publications and Projects that have been posted here by contextsensitivesolutions.org site members . To search for a particular project, enter a keyword or click on "Advanced Search."


     Projects      Case Studies

1 2 >
Sort by:    Sort Up Icon Title    Status    State   

6th Street Undercrossing

Santa Rosa, CA (Completed 2012)

This project creates a vital crosstown link for pedestrians, bicyclists, and vehicles. On one side, it opens up into the West End Neighborhood, Railroad Square, the CHOPS Teen Center, the future SMART station, and miles of creek trails. On the... more

Aesthetic Guardrail Design, SR-20 - Ducken Road to Rosario

Aesthetic Guardrail Design, SR-20 - Ducken Road to Rosario

(Started 2000, Completed 2007)

The purpose of this project is to improve safety and reduce accident frequency and severity. Within this section of SR-20, a primary issue is upgrading it to bike touring standards.

Barracks Row

Barracks Row

Washington, DC (Started 2000, Completed 2004-01)

8th Street Barracks Row, a 3/4 mile, 6 block stretch between Pennsylvania Avenue and M Street SE, is one of the District's oldest commercial corridors. 8th Street's turn of the century buildings give the street charm and character, but over the... more

Bruce R.Watkins Drive

Kansas City, MO (Completed 2001)

Bruce R. Watkins Drive, a Missouri Department of Transportation project, is a 10.2 mile-long artery, which links downtown Kansas City to Southtown. The design and construction of this project included aesthetic design with environmental... more

Burlington, Iowa: Revitalizing a Struggling Small Downtown

Burlington, IA (Started 1999, Completed 2006)

Burlington, Iowa, was a significant Midwestern river and rail transportation hub from the 1820s til the mid-twentieth century. Manufacturing remains an important component of the local economy, but sprawling suburban development has made it... more

Cobblestone Street Interpretive Park

Cobblestone Street Interpretive Park

Boonville, MO

As the Missouri Department of Transportation was planning the construction of a new bridge over the Missouri River, a cobblestone street, believed to be the first paved street west of St. Louis, was re-discovered in the town of Boonville. The... more

The purpose of this project was to address safety and capacity issues, with improved geometrics. Environmental and cultural enhancements were also included in the project.

Cody-Yellowstone Highway Project, Wyoming

Cody, WY

The purpose of this project was to address safety and capacity issues, with improved geometrics. Environmental and cultural enhancements were also included in the project.

Cutler-Orosi, California: Community-Based Transportation Planning

Orosi, CA (Started 2001)

The two agricultural communities of Cutler and Orosi, CA were struggling with high poverty rates, inadequate water and sewer capacity, and a dangerous traffic problems on the main street/ state highway. Through an innovative design... more

Demonbreun Viaduct Nashville, TN

Nashville, TN (Started 2004-07, Completed 2006-10)

The Demondreun Viaduct in downtown Nashville, TN was closed due to strutural deficiency. This closing restricted a roadway that served as a "backdoor" route to downtown Nashville and closed a transit landport as well as hampered traffic to many... more

Façades, Festivals, and Footpaths: Greenville, Kentucky’s Downtown Redevelopment

Greenville, KY (Started 2007)

Five years ago if you took a stroll down Main Street in Greenville, Kentucky on a Saturday night you would have likely walked on deteriorated sidewalks, peered into vacant storefronts with dilapidated façades, and felt enveloped by silence and... more

Recycled facade from old Childrenメs Facility will be used on the MCPARC Welcome Center.

Fairmont Gateway Connector: Fairmont, WV

Providing an improved highway link between downtown Fairmont and I-79, the Fairmont Gateway Connector is a multi-phased economic development and transportation project that alleviates congestion while focusing on treasured community... more

Feasibility Study, Maine Route 1

Bath, ME (Completed 2005)

Public Engagement

A key component of the Bath Feasibility Study was public involvement. The outreach program included several public forums including a public goal-setting workshop, a public informational meeting and... more

The existing Four Bears Bridge (ND 23) was narrow and could not accommodate existing traffic (functionally obsolete).

Four Bears Bridge Replacement

Four Bears Village, ND

The existing Four Bears Bridge (ND 23) was narrow and could not accommodate existing traffic (functionally obsolete). The new Four Bears Bridge provided a modern bridge that eliminated restrictions posed by the earlier bridge. It also accommodated... more

Highway through Mutzig, France

Highway through Mutzig, France

Mutzig

"Mutzig is one of the many beautiful towns in Alsace, and the conversion that was made of the main street in the 1980s lives up completely to the inherent charm of the town."

Houghton Streetscape and Brick Street Re-Installation

Houghton, MI (Started 2007, Completed 2009)

The Michigan Department of Transportation (MDOT) Ishpeming Transportation Service Center (TSC) and its partners took an innovative approach on the US-41 Houghton, Michigan, downtown streetscape project by, among other things, actually drawing... more

I-405 Corridor Program

(Completed 2005)

It is the intent of the Washington Department of Transportation (WSDOT) to integrate community values into the design of the I-405 Design/Build Project. As a consultant to WSDOT, HNTB is accomplishing this important goal by fully employing the... more

Courtesy of Greg Westergaard, ODOT Photo/Video

I-84 Corridor Strategy

(Completed 2013)

Interstate 84 in the Columbia River Gorge National Scenic Area (CRGNSA) is a critically important corridor that serves as a primary regional transportation artery, a key interstate freight route, and a scenic highway.

I-90 Two-Way Transit and HOV Operations, Seattle to Bellevue, Washington

Seattle, Bellevue, WA (Started 1998)

To improve regional mobility by providing reliable and safe two-way transit and HOV operations on Interstate 90 between Bellevue and Seattle, while minimizing impacts to the environment and to other users and transportation modes.

The I-90... more

Improving Neighborhood Connections, I-465 Reconstruction

Indianapolis, IN

The purpose of the project is the reconstruction of a 12-mile segment of beltway around Indianapolis to provide increased capacity and replace deteriorated infrastructure. Mainline roadway, interchanges, and bridges all required reconstruction as... more

Indianapolis Cultural Trail

Indianapolis, IN (Started 2000, Completed 2013-05)

Leaders in the city of Indianapolis, Indiana, wanted to make it easier for people to visit the city’s cultural districts, which were disconnected from the heart of downtown and didn’t get the attention they merited. In a city with a successful... more

1 2 >


Feedback, questions, comments, or problems?
email info@contextsensitivesolutions.org

Copyright © 2005 Context Sensitive Solutions.org. All rights reserved.
About Us | Site Map | Privacy Policy

United States Department of Transportation - logo
Privacy Policy | Freedom of Information Act (FOIA) | Accessibility | Web Policies & Notices | No Fear Act | Report Waste, Fraud and Abuse | U.S. DOT Home |
USA.gov | WhiteHouse.gov

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000