Case Studies

This database includes both Case Studies that have been described in official publications and Projects that have been posted here by contextsensitivesolutions.org site members . To search for a particular project, enter a keyword or click on "Advanced Search."


     Projects      Case Studies

1 2 3 4 >
Sort by:    Sort Up Icon Title    Status    State   

6th Street Undercrossing

Santa Rosa, CA (Completed 2012)

This project creates a vital crosstown link for pedestrians, bicyclists, and vehicles. On one side, it opens up into the West End Neighborhood, Railroad Square, the CHOPS Teen Center, the future SMART station, and miles of creek trails. On the... more

WEC Group

A New Vision For West Eugene

Eugene, OR (Started 2009-02)

This planning effort was initiated on the heels of a failed major bypass project planned for 20 years, to relieve traffic congestion in Eugene, OR that left the community extremely polarized. The objectives of the West Eugene Collaborative can be... more

Earning rave reviews from the City of Shoreline and the public, the project garnered formal recognition from the American Road & Transportation Builders Association (ARTBA) with its Globe Award, which honors U.S. transportation construction projects that demonstrate environmental excellence and stewardship and serve as role models for other projects.

Aurora Multimodal and Interurban Bridge Project

Shoreline, WA (Started 2007-06)

Community desires to improve the quality of life in the city; promote development; security; stormwater quality; aesthetics.

Bruce R.Watkins Drive

Kansas City, MO (Completed 2001)

Bruce R. Watkins Drive, a Missouri Department of Transportation project, is a 10.2 mile-long artery, which links downtown Kansas City to Southtown. The design and construction of this project included aesthetic design with environmental... more

Burlington, Iowa: Revitalizing a Struggling Small Downtown

Burlington, IA (Started 1999, Completed 2006)

Burlington, Iowa, was a significant Midwestern river and rail transportation hub from the 1820s til the mid-twentieth century. Manufacturing remains an important component of the local economy, but sprawling suburban development has made it... more

Churton Downtown

Hillsborough, NC

The following charge was given to responding correspondents for the downtown study: A Downtown Traffic Demand Management and efficiency assessment to include looking at signalization (timing, synchronization and dedicated left turns), turn... more

Coachella Valley Vista Point 3

Coachella Valley Vista Point

Coachella, CA (Completed 2011-06-30)

This project originally started due to a need to upgrade the existing site amenities of the existing vista point facility to comply with the Americans with Disabilities Act (ADA) and reduce maintenance expenditures. Caltrans maintenance identified... more

Community and Transportation Linkage Planning Program

Albany, NY

The Capital District Transportation Committee (CDTC) is the Metropolitan Planning Organization (MPO) for New York's Capital Region (Albany, NY). CDTC initiated the Community and Transportation Linkage Planning Program (the Linkage Program) in 2000... more

Cunningham Avenue Imagery

Cunningham Avenue Beautification

Urbana, IL

The majority of the existing corridor was developed in the County and was later annexed in the City. This created areas of non-conformity with the City's zoning and subdivision ordinances and a significant number of curb cuts along Cunningham... more

Design for Reconstruction of US 93: Evaro to Polson, Montana

Evaro, MT

US 93 runs from Arizona to Canada. It is a two-lane road through much of Montana, entering big-sky country from Idaho at Lost Trail pass and passing through Missoula, Kalispell, the Flathead Indian Reservation, and along the western shore of Flathead... more

Edgartown, Massachusetts: Promoting Walkable, Attractive Development on Upper Main Street

Edgartown, MA (Started 1990)

This case study examines ways in which to ensure the character, quality and pedestrian-orientation of historic, downtown main street facing typical, strip commercial, auto-oriented development patterns. The economy of this 19th century whaling... more

El Camino

In recognition of the Spanish migration from the Atlantic coast to the present U.S. Mexico border, each state has designated the roadways the compromise the route as the El Camino East/West Corridor in order to promote tourism and historic... more

Eugene A. Carter Memorial Bridge

Charleston, WV (Started 2009-06-06)

This bridge was overdue for cleaning and painting. Also, this bridge is prone to icy conditions in the winter months. It was decided to add a skid-resistant surface to the deck and the approach spans.

Façades, Festivals, and Footpaths: Greenville, Kentucky’s Downtown Redevelopment

Greenville, KY (Started 2007)

Five years ago if you took a stroll down Main Street in Greenville, Kentucky on a Saturday night you would have likely walked on deteriorated sidewalks, peered into vacant storefronts with dilapidated façades, and felt enveloped by silence and... more

Feasibility Study, Maine Route 1

Bath, ME (Completed 2005)

Public Engagement

A key component of the Bath Feasibility Study was public involvement. The outreach program included several public forums including a public goal-setting workshop, a public informational meeting and... more

Ribbon Cutting

Frederick MARC Station and Extension of East Street

Frederick, MD (Completed 2001-01)

The project involved two phases. First, the designers prepared a pedestrian circulation study for the City of Frederick describing existing movement patterns and potential pedestrian routes once the station was complete. Plans were then developed for... more

Green Ribbon Project

Houston, TX (Started 1997, Completed 2001)

The purpose of the Green Ribbon Project was to provide the Texas Department of Transportation (TxDOT) with conceptual guidelines to integrate environmental aesthetics with roadway functionality. This project was intended to set forth a broad... more

Before After

Henderson Interstate 215/515 Interchange

Henderson, NV (Started 2005-01-02)

One of the biggest issues facing Nevada DOT is explosive growth rates in the Las Vegas Valley. This growth, along with the accompanying industries and businesses, overwhelmed the highway system's capacity. Part of the solution included building ... more

Houghton Streetscape and Brick Street Re-Installation

Houghton, MI (Started 2007, Completed 2009)

The Michigan Department of Transportation (MDOT) Ishpeming Transportation Service Center (TSC) and its partners took an innovative approach on the US-41 Houghton, Michigan, downtown streetscape project by, among other things, actually drawing... more

I-405 Corridor Program

(Completed 2005)

It is the intent of the Washington Department of Transportation (WSDOT) to integrate community values into the design of the I-405 Design/Build Project. As a consultant to WSDOT, HNTB is accomplishing this important goal by fully employing the... more

1 2 3 4 >


Feedback, questions, comments, or problems?
email info@contextsensitivesolutions.org

Copyright © 2005 Context Sensitive Solutions.org. All rights reserved.
About Us | Site Map | Privacy Policy

United States Department of Transportation - logo
Privacy Policy | Freedom of Information Act (FOIA) | Accessibility | Web Policies & Notices | No Fear Act | Report Waste, Fraud and Abuse | U.S. DOT Home |
USA.gov | WhiteHouse.gov

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000