Case Studies

This database includes both Case Studies that have been described in official publications and Projects that have been posted here by contextsensitivesolutions.org site members . To search for a particular project, enter a keyword or click on "Advanced Search."


     Projects      Case Studies

1 2 3 4 5 6 >
Sort by:    Sort Up Icon Title    Status    State   
Courtesy of DDOT

11th Street Bridges Project

Washington, DC (Started 2008-07-02)

The incomplete freeway system in Southeast Washington forces drivers to exit the freeway onto neighborhood streets to reach their destinations. Some of the primary routes are through environmental justice neighborhoods. Freeway and local street... more

The purpose of this project was to reconstruct a six-mile section of urban arterial to address capacity and safety issues, in addition to providing a stimulation to the local economy.

12300 South Design Build Project, Draper and Riverton, Utah

Draper, UT

The purpose of this project was to reconstruct a six-mile section of urban arterial to address capacity and safety issues, in addition to providing a stimulation to the local economy.

28th - 31st Avenue Connector Builds Bridges in Nashville

Nashville, TN

For several decades, Interstate 40 and a CSX railroad line separated North Nashville from West End and limited social and economic interaction between those communities. The recently completed 28th-31st Avenue Connector spans the railroad tracks... more

6th Street Undercrossing

Santa Rosa, CA (Completed 2012)

This project creates a vital crosstown link for pedestrians, bicyclists, and vehicles. On one side, it opens up into the West End Neighborhood, Railroad Square, the CHOPS Teen Center, the future SMART station, and miles of creek trails. On the... more

I-465 Concept Hierarchy

Accelerate I-465

Indianapolis, IN

For reasons of increasing capacity and improving safety, the I-465 project, titled “Accelerate 465,” consists of freeway reconstruction, upgrades of interchange ramps and mainline capabilities, improved geometrics and access upgrades to major... more

Access Management Plan: US Highway 10

Detroit Lakes, MN (Completed 2002)

The Access Management Plan for Highway 10 through Detroit Lakes was needed to improve safety and maintain mobility for through traffic while providing appropriate access to the local community.

This project is located in the City of... more

Arterial Relations: Widening a one-mile stretch of Pennsylvania roadway far from routine

Altoona, PA

The widening of a one-mile stretch of Park Avenue roadway near Altoona, Pa., was far from routine. The nine-year project impacted more than 80 properties – businesses and residences – resulted in more than 35 right-of-way acquisitions and... more

Earning rave reviews from the City of Shoreline and the public, the project garnered formal recognition from the American Road & Transportation Builders Association (ARTBA) with its Globe Award, which honors U.S. transportation construction projects that demonstrate environmental excellence and stewardship and serve as role models for other projects.

Aurora Multimodal and Interurban Bridge Project

Shoreline, WA (Started 2007-06)

Community desires to improve the quality of life in the city; promote development; security; stormwater quality; aesthetics.

Austin Accessibility Assessment Improvement (AAAIM)

Austin, TX

Persons with disabilities have long voiced concerns about the lack of integrated access between Capital Metro's (CMTA) fixed-route bus stops and the City of Austin's transportation network, particularly the pedestrian infrastructure, a disconnect... more

The existing facility had a narrow roadway that posed safety issues and mobility issues due to limited passing opportunities on the winding, mountainous road.

Berthoud Pass Mountain Access Project - Phases 1 and 2

Clear Creek County, CO

The existing facility had a narrow roadway that posed safety issues and mobility issues due to limited passing opportunities on the winding, mountainous road. The existing roadway also posed numerous environmental problems due to: 1) poor... more

Big Bear Plan

Big Bear Bridge

Big Bear, CA

Time, heavy use and severe weather has critically affected the road and the dam beneath it. Seismic retrofitting of the dam will require the elimination of the existing road, which has two 10.5' lanes with 0' shoulders and a 3.5' sidewalk which... more

Blue Water Bridge Aesthetic Design Guide

Port Huron, MI

Billions of dollars of trade pass through crossings in Michigan to and from Canada each year. At the Blue Water Bridge crossing, increases in wait time and new improved security measures require a redesign of the plaza and highway approach in the... more

The goal of the project is to develop Bridgeport Way as a corridor that will improve traffic safety, increase the mobility and cohesiveness of the community, enhance the appearance of the corridor, and control traffic growth.

Bridgeport Way Reconstruction

University Place, WA

The purpose of this project was to address the safety concerns due to the high number of crashes over the past years. At the same time it was viewed essential to the vision statement of the City Council that aimed in improving the quality of life in... more

Bruce R.Watkins Drive

Kansas City, MO (Completed 2001)

Bruce R. Watkins Drive, a Missouri Department of Transportation project, is a 10.2 mile-long artery, which links downtown Kansas City to Southtown. The design and construction of this project included aesthetic design with environmental... more

Burlington, Iowa: Revitalizing a Struggling Small Downtown

Burlington, IA (Started 1999, Completed 2006)

Burlington, Iowa, was a significant Midwestern river and rail transportation hub from the 1820s til the mid-twentieth century. Manufacturing remains an important component of the local economy, but sprawling suburban development has made it... more

This worn path across several vacant lots is now McVay Street.

Charlotte's Urban Street Design Guidelines

Charlotte, NC

The USDG is one of a set of policies (including the Centers, Corridors, & Wedges Growth Framework and the Transportation Action Plan) intended to transform Charlotte into a more sustainable city and create more context-sensitive streets. First, the... more

Churton Downtown

Hillsborough, NC

The following charge was given to responding correspondents for the downtown study: A Downtown Traffic Demand Management and efficiency assessment to include looking at signalization (timing, synchronization and dedicated left turns), turn... more

Corridor Alignment Urban Design and Community Outreach Services Pasadena Blue Line LRT

Pasadena, CA (Started 2005)

The new 13.6-mile extension of the Blue Line will run from Union Station in downtown Los Angeles into Pasadena, serving the communities of Chinatown, Highland Park, and South Pasadena along the way.

The Pasadena Blue Line is a light... more

Corridor Management Plan: Minnesota Highway 38 Edge of the Wilderness National Scenic Byway

Grand Rapids, MN (Completed 1995)

The purpose of creating a Corridor Management Plan was to coordinate the philosophies and activities of land management agencies with those of the state and county authorities responsible for planning, designing, constructing, and maintaining a... more

Cottonwood Street Environmental Assessment

Murray, UT

The Cottonwood Street EA (located in Murray, Utah) reflects a number of CSS principles. One of the main goals of this project is to create a more livable, walkable community through construction of a new one-way couplet with bike lanes, improved... more

1 2 3 4 5 6 >


Feedback, questions, comments, or problems?
email info@contextsensitivesolutions.org

Copyright © 2005 Context Sensitive Solutions.org. All rights reserved.
About Us | Site Map | Privacy Policy

United States Department of Transportation - logo
Privacy Policy | Freedom of Information Act (FOIA) | Accessibility | Web Policies & Notices | No Fear Act | Report Waste, Fraud and Abuse | U.S. DOT Home |
USA.gov | WhiteHouse.gov

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000