This database includes both Case Studies that have been described in official publications and Projects that have been posted here by contextsensitivesolutions.org site members . To search for a particular project, enter a keyword or click on "Advanced Search."


     Projects      Case Studies

1 2 3 4 5 >
Sort by:    Sort Up Icon Title    Status    State   
The purpose of this project was to reconstruct a six-mile section of urban arterial to address capacity and safety issues, in addition to providing a stimulation to the local economy.

12300 South Design Build Project, Draper and Riverton, Utah

Draper, UT

The purpose of this project was to reconstruct a six-mile section of urban arterial to address capacity and safety issues, in addition to providing a stimulation to the local economy.

28th - 31st Avenue Connector Builds Bridges in Nashville

Nashville, TN

For several decades, Interstate 40 and a CSX railroad line separated North Nashville from West End and limited social and economic interaction between those communities. The recently completed 28th-31st Avenue Connector spans the railroad tracks... more

6th Street Undercrossing

Santa Rosa, CA (Completed 2012)

This project creates a vital crosstown link for pedestrians, bicyclists, and vehicles. On one side, it opens up into the West End Neighborhood, Railroad Square, the CHOPS Teen Center, the future SMART station, and miles of creek trails. On the... more

Abita Springs Roundabout

Abita Springs, LA (Started 2004-04-15, Completed 2008-03-03)

Congestion during peak hours due to the strange configuration of the intersection initiated this project.

I-465 Concept Hierarchy

Accelerate I-465

Indianapolis, IN

For reasons of increasing capacity and improving safety, the I-465 project, titled “Accelerate 465,” consists of freeway reconstruction, upgrades of interchange ramps and mainline capabilities, improved geometrics and access upgrades to major... more

AR 215, Ozark National Forest, AR

AR 215, Ozark National Forest, AR

Purpose and Need: Inadequate roadway for current and anticipated traffic - travel lane too narrow, surface rough (gravel), and unnecessary amount of dust and siltation produced, detracting from the personal experience and water quality of the streams... more

Arterial Relations: Widening a one-mile stretch of Pennsylvania roadway far from routine

Altoona, PA

The widening of a one-mile stretch of Park Avenue roadway near Altoona, Pa., was far from routine. The nine-year project impacted more than 80 properties – businesses and residences – resulted in more than 35 right-of-way acquisitions and... more

Earning rave reviews from the City of Shoreline and the public, the project garnered formal recognition from the American Road & Transportation Builders Association (ARTBA) with its Globe Award, which honors U.S. transportation construction projects that demonstrate environmental excellence and stewardship and serve as role models for other projects.

Aurora Multimodal and Interurban Bridge Project

Shoreline, WA (Started 2007-06)

Community desires to improve the quality of life in the city; promote development; security; stormwater quality; aesthetics.

The existing facility had a narrow roadway that posed safety issues and mobility issues due to limited passing opportunities on the winding, mountainous road.

Berthoud Pass Mountain Access Project - Phases 1 and 2

Clear Creek County, CO

The existing facility had a narrow roadway that posed safety issues and mobility issues due to limited passing opportunities on the winding, mountainous road. The existing roadway also posed numerous environmental problems due to: 1) poor... more

r1

Blue Ridge Road Grade-Separation Project

Raleigh, NC (Started 2011)

The proposed Blue Ridge Road grade-separation project in west Raleigh will lower the grade of Blue Ridge Road, carrying it under (currently intersecting) Hillsborough Street and Beryl Drive, as well as a busy at-grade railroad crossing between the... more

Bridge Retrofits, I-70 North

St. Louis, MO (Started 2001, Completed 2002)

MoDOT had recently completed 10 miles of urban I-70 interstate using a standard design palette that neighboring residents disliked. Particularly when compared to recent context sensitive solutions development and community input in the adjacent... more

Burlington, Iowa: Revitalizing a Struggling Small Downtown

Burlington, IA (Started 1999, Completed 2006)

Burlington, Iowa, was a significant Midwestern river and rail transportation hub from the 1820s til the mid-twentieth century. Manufacturing remains an important component of the local economy, but sprawling suburban development has made it... more

City of Ball Ground, Georgia Master Plan

Ball Ground, GA (Completed 2007-12-13)

-- Excerpt from City of Ball Ground, Georgia Master Plan Submission Form --

more

Coachella Valley Vista Point 3

Coachella Valley Vista Point

Coachella, CA (Completed 2011-06-30)

This project originally started due to a need to upgrade the existing site amenities of the existing vista point facility to comply with the Americans with Disabilities Act (ADA) and reduce maintenance expenditures. Caltrans maintenance identified... more

The purpose of this project was to address safety and capacity issues, with improved geometrics. Environmental and cultural enhancements were also included in the project.

Cody-Yellowstone Highway Project, Wyoming

Cody, WY

The purpose of this project was to address safety and capacity issues, with improved geometrics. Environmental and cultural enhancements were also included in the project.

The purpose of the project was to replace two existing functionally obsolete truss bridges crossing the Cooper River in Charleston Harbor.

Cooper River Bridge Replacement Project

Charleston Harbor, SC

The purpose of the project was to replace two existing functionally obsolete truss bridges crossing the Cooper River in Charleston Harbor. The new structure would need to 1) Increase the capacity of US 17 over the Cooper River, 2) Improved traffic... more

Corridor Management Plan: Minnesota Highway 38 Edge of the Wilderness National Scenic Byway

Grand Rapids, MN (Completed 1995)

The purpose of creating a Corridor Management Plan was to coordinate the philosophies and activities of land management agencies with those of the state and county authorities responsible for planning, designing, constructing, and maintaining a... more

Cutler-Orosi, California: Community-Based Transportation Planning

Orosi, CA (Started 2001)

The two agricultural communities of Cutler and Orosi, CA were struggling with high poverty rates, inadequate water and sewer capacity, and a dangerous traffic problems on the main street/ state highway. Through an innovative design... more

9-3-09 Image

Dana to Downtown

Redding, CA (Completed 2010-08)

State Route 44 through Redding serves as a primary east/west connector for both local and interregional travelers. This segment of freeway crosses the Sacramento River and serves as a gateway and first impression for those entering the downtown... more

Design for Reconstruction of US 93: Evaro to Polson, Montana

Evaro, MT

US 93 runs from Arizona to Canada. It is a two-lane road through much of Montana, entering big-sky country from Idaho at Lost Trail pass and passing through Missoula, Kalispell, the Flathead Indian Reservation, and along the western shore of Flathead... more

1 2 3 4 5 >


Feedback, questions, comments, or problems?
email info@contextsensitivesolutions.org

Copyright © 2005 Context Sensitive Solutions.org. All rights reserved.
About Us | Site Map | Privacy Policy

United States Department of Transportation - logo
Privacy Policy | Freedom of Information Act (FOIA) | Accessibility | Web Policies & Notices | No Fear Act | Report Waste, Fraud and Abuse | U.S. DOT Home |
USA.gov | WhiteHouse.gov

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000