Case Studies

This database includes both Case Studies that have been described in official publications and Projects that have been posted here by contextsensitivesolutions.org site members . To search for a particular project, enter a keyword or click on "Advanced Search."


     Projects      Case Studies

1 2 3 4 >
Sort by:    Sort Up Icon Title    Status    State   
Courtesy of DDOT

11th Street Bridges Project

Washington, DC (Started 2008-07-02)

The incomplete freeway system in Southeast Washington forces drivers to exit the freeway onto neighborhood streets to reach their destinations. Some of the primary routes are through environmental justice neighborhoods. Freeway and local street... more

6th Street Undercrossing

Santa Rosa, CA (Completed 2012)

This project creates a vital crosstown link for pedestrians, bicyclists, and vehicles. On one side, it opens up into the West End Neighborhood, Railroad Square, the CHOPS Teen Center, the future SMART station, and miles of creek trails. On the... more

Abita Springs Roundabout

Abita Springs, LA (Started 2004-04-15, Completed 2008-03-03)

Congestion during peak hours due to the strange configuration of the intersection initiated this project.

Access Management Plan: US Highway 10

Detroit Lakes, MN (Completed 2002)

The Access Management Plan for Highway 10 through Detroit Lakes was needed to improve safety and maintain mobility for through traffic while providing appropriate access to the local community.

This project is located in the City of... more

Bridge Retrofits, I-70 North

St. Louis, MO (Started 2001, Completed 2002)

MoDOT had recently completed 10 miles of urban I-70 interstate using a standard design palette that neighboring residents disliked. Particularly when compared to recent context sensitive solutions development and community input in the adjacent... more

Bruce R.Watkins Drive

Kansas City, MO (Completed 2001)

Bruce R. Watkins Drive, a Missouri Department of Transportation project, is a 10.2 mile-long artery, which links downtown Kansas City to Southtown. The design and construction of this project included aesthetic design with environmental... more

Churton Downtown

Hillsborough, NC

The following charge was given to responding correspondents for the downtown study: A Downtown Traffic Demand Management and efficiency assessment to include looking at signalization (timing, synchronization and dedicated left turns), turn... more

Corridor Alignment Urban Design and Community Outreach Services Pasadena Blue Line LRT

Pasadena, CA (Started 2005)

The new 13.6-mile extension of the Blue Line will run from Union Station in downtown Los Angeles into Pasadena, serving the communities of Chinatown, Highland Park, and South Pasadena along the way.

The Pasadena Blue Line is a light... more

Corridor Management Plan: Minnesota Highway 38 Edge of the Wilderness National Scenic Byway

Grand Rapids, MN (Completed 1995)

The purpose of creating a Corridor Management Plan was to coordinate the philosophies and activities of land management agencies with those of the state and county authorities responsible for planning, designing, constructing, and maintaining a... more

Design for Reconstruction of US 93: Evaro to Polson, Montana

Evaro, MT

US 93 runs from Arizona to Canada. It is a two-lane road through much of Montana, entering big-sky country from Idaho at Lost Trail pass and passing through Missoula, Kalispell, the Flathead Indian Reservation, and along the western shore of Flathead... more

El Camino

In recognition of the Spanish migration from the Atlantic coast to the present U.S. Mexico border, each state has designated the roadways the compromise the route as the El Camino East/West Corridor in order to promote tourism and historic... more

Elgin-O'Hare Study Area Map

Elgin O'Hare-West Bypass (EOWB)

(Started 2007)

The study area includes the second largest concentration of employment in Illinois. It is also adjacent to one of the nations busiest airports, within the nexus of 5 interstates, and includes major commuter rail and bus service as well as major... more

Eugene A. Carter Memorial Bridge

Charleston, WV (Started 2009-06-06)

This bridge was overdue for cleaning and painting. Also, this bridge is prone to icy conditions in the winter months. It was decided to add a skid-resistant surface to the deck and the approach spans.

Façades, Festivals, and Footpaths: Greenville, Kentucky’s Downtown Redevelopment

Greenville, KY (Started 2007)

Five years ago if you took a stroll down Main Street in Greenville, Kentucky on a Saturday night you would have likely walked on deteriorated sidewalks, peered into vacant storefronts with dilapidated façades, and felt enveloped by silence and... more

Feasibility Study, Maine Route 1

Bath, ME (Completed 2005)

Public Engagement

A key component of the Bath Feasibility Study was public involvement. The outreach program included several public forums including a public goal-setting workshop, a public informational meeting and... more

The purpose of this project was to replace a low water crossing over the Frio River quickly and with minimum impact on the recreational visitors and the water quality.

FM 1120 Low Water Crossing, Real County, Texas

Real County, TX

The purpose of this project was to replace a low water crossing over the Frio River quickly and with minimum impact on the recreational visitors and the water quality. The crossing was in need of replacement due to a series of floods that had... more

Grade Separation: Wichita Central Corridor Railroad

Wichita, KS (Started 2005-03, Completed 2008)

In the 1990s, Wichita began to explore the impact of growth on its existing transportation facilities, land use, and development. A specific effort was to assess the increased train traffic going through the city due to the merger of Union Pacific... more

Green Ribbon Project

Houston, TX (Started 1997, Completed 2001)

The purpose of the Green Ribbon Project was to provide the Texas Department of Transportation (TxDOT) with conceptual guidelines to integrate environmental aesthetics with roadway functionality. This project was intended to set forth a broad... more

I-25 New Pueblo Freeway

Pueblo, CO

Through Pueblo, I-25 serves interstate travel, regional travel to and from Pueblo, and trips with origins and destination within Pueblo. I-25 serves north/south travel, but has created a barrier to east/west mobility. Communities were divided by the... more

I-405 Corridor Program

(Completed 2005)

It is the intent of the Washington Department of Transportation (WSDOT) to integrate community values into the design of the I-405 Design/Build Project. As a consultant to WSDOT, HNTB is accomplishing this important goal by fully employing the... more

1 2 3 4 >


Feedback, questions, comments, or problems?
email info@contextsensitivesolutions.org

Copyright © 2005 Context Sensitive Solutions.org. All rights reserved.
About Us | Site Map | Privacy Policy

United States Department of Transportation - logo
Privacy Policy | Freedom of Information Act (FOIA) | Accessibility | Web Policies & Notices | No Fear Act | Report Waste, Fraud and Abuse | U.S. DOT Home |
USA.gov | WhiteHouse.gov

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000