This database includes both Case Studies that have been described in official publications and Projects that have been posted here by contextsensitivesolutions.org site members . To search for a particular project, enter a keyword or click on "Advanced Search."


     Projects      Case Studies

1 2 >
Sort by:    Sort Up Icon Title    Status    State   
Courtesy of DDOT

11th Street Bridges Project

Washington, DC (Started 2008-07-02)

The incomplete freeway system in Southeast Washington forces drivers to exit the freeway onto neighborhood streets to reach their destinations. Some of the primary routes are through environmental justice neighborhoods. Freeway and local street... more

Bell Street Model

Bell Street Park

Seattle, WA

A single-purpose right-of-way is being transformed into a vibrant, safe, and green public space. This 4-block section is the first phase of a long-range plan for a park corridor stretching from South Lake Union to Elliott Bay. When high land... more

r1

Blue Ridge Road Grade-Separation Project

Raleigh, NC (Started 2011)

The proposed Blue Ridge Road grade-separation project in west Raleigh will lower the grade of Blue Ridge Road, carrying it under (currently intersecting) Hillsborough Street and Beryl Drive, as well as a busy at-grade railroad crossing between the... more

Design for Reconstruction of US 93: Evaro to Polson, Montana

Evaro, MT

US 93 runs from Arizona to Canada. It is a two-lane road through much of Montana, entering big-sky country from Idaho at Lost Trail pass and passing through Missoula, Kalispell, the Flathead Indian Reservation, and along the western shore of Flathead... more

MSU Central Campus

Farm Lane Underpasses

East Lansing, MI (Started 2007, Completed 2009)

Eliminating the current at-grade railroad crossings on Farm Lane will increase safety for motorists, pedestrians and cyclists, and decrease response times for emergency vehicles. More than 1 million rail cars travel through this region each... more

Green Ribbon Project

Houston, TX (Started 1997, Completed 2001)

The purpose of the Green Ribbon Project was to provide the Texas Department of Transportation (TxDOT) with conceptual guidelines to integrate environmental aesthetics with roadway functionality. This project was intended to set forth a broad... more

32nd Ave SW After

High Point Redevelopment Street

Seattle, WA (Started 2000, Completed 2009)

The housing stock of this 120 acre redevelopment was in need of replacement. Along with the rebuilding, a thorough re-plating and replacement of the street grid was undertaken. At the same time, the City of Seattle's stormwater utility, Seattle... more

Collapsed Bridge

I-35W St. Anthony Bridge Collapse and Reconstruction Over Mississippi River

Minneapolis, MN (Completed 2008-09-18)

The I-35W St. Anthony Bridge replacement project is hereby offered as a CSS National Dialog submission case study because it demonstrates a unique and amazing local and national story and most surprisingly to some that under extreme... more

I-485 South Blvd Parking Deck Under Construction in Ravine

I-485/South Boulevard Station Parking Deck - LYNX Blue Line Light Rail Project

Charlotte, NC

CATS needed a large real estate parcel to construct the I-485/South Boulevard light rail parking deck at the end of the line. There was limited availability of existing real estate. After a suggestion by a local resident during a community... more

I-96 at 36th Street: New Interchange

Grand Rapids, MI (Started 2005, Completed 2006)

The project will include constructing a new interchange on I-96 at 36th Street. Currently, the Kent County Road Commission is nearing completion of the extension of 36th Street. The interchange will tie into this extension. Upon completion, this new... more

Connecting Dallas Timeline

IH-30 East Gateway

Dallas, TX

Over fifty years ago, Fair Park, portions of Deep Ellum, and adjacent neighborhoods were separated from the rest of the city by the construction of Interstate 30. While the highway provided much-needed mobility and helped suburban development, there... more

Improvements to the Self-Guiding Tour Routes

Murfreesboro, TN (Started 2009)

Issues that initiated this project include the inadequacy of the existing auto tour route in its ability to allow visitors to experience the important historic elements of the battlefield effectively and gain a sense of place; a lack of accessibility... more

Indianapolis Cultural Trail

Indianapolis, IN (Started 2000, Completed 2013-05)

Leaders in the city of Indianapolis, Indiana, wanted to make it easier for people to visit the city’s cultural districts, which were disconnected from the heart of downtown and didn’t get the attention they merited. In a city with a successful... more

Interstate 70 through Glenwood Canyon, Colorado

(Started 1992)

Strong legislative intent from the US Congress and Colorado state legislature to preserve and protect the canyon iniatiated this project, along with local environmental groups' pressure to protect the canyon.

The north trailhead will take a rectilinear geometry, recalling the rock fences and patchwork of pastures in
the surrounding landscape. Large swathes of perennials will intermingle with the rigid form of the trailhead.
Bosques of trees will mimic the long allees of trees that line roadsides and country estates in Lexington.

Legacy Trail

Lexington, KY

In anticipation of the 2010 Alltech FEI World Equestrian Games, Lexington desired a method of connection to downtown Lexington, Kentucky from the Kentucky Horse Park. In addition to this major event, officials and stakeholders, knowing that the... more

M-25: White Rock Motorist Park

White Rock Motorist Park is located along Lake Huron off M-25 in Huron County. The park preserves the natural character of the site and enhances the travel experience. Components of the motorist park include a picnic area, restroom... more

Mercer Corridor

Mercer Corridor Improvements Project

Seattle, WA

Past design proposals for the Mercer Corridor had focused primarily upon moving vehicular traffic through the South Lake Union area. The solutions had unacceptable impacts and high costs for implementation. However, the new neighborhood plans and the... more

A doublespan stone bridge along the Merritt Parkway.

Merritt Parkway

An excellent example of a holistic design approach is the Merritt Parkway in Connecticut. Designed and built in the 1930's, its overall design philosophy was to build a graceful highway set in a natural environment. The result was a highway that not... more

Views of 195’ and 320’ Span Options from the Tri-boro Expressway

MonFayette Expressway

Pittsburgh, PA

The Monongehela River Valley was the cradle of the steel industry in the US. The steel industry was built on rail and barge transport, so there never was a decent road system in the valley. The steel industry essentially disappeared in the... more

Natchez Trace Parkway Multi-Use Trail

Jackson, MS

The primary issue that initiated the design and construction of the Natchez Trace multi-use trail in the Jackson, Mississippi metropolitan area is safety and a need to resolve and minimize conflicts between motorists, bicyclists, and pedestrians in... more

1 2 >


Feedback, questions, comments, or problems?
email info@contextsensitivesolutions.org

Copyright © 2005 Context Sensitive Solutions.org. All rights reserved.
About Us | Site Map | Privacy Policy

United States Department of Transportation - logo
Privacy Policy | Freedom of Information Act (FOIA) | Accessibility | Web Policies & Notices | No Fear Act | Report Waste, Fraud and Abuse | U.S. DOT Home |
USA.gov | WhiteHouse.gov

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000