This database includes both Case Studies that have been described in official publications and Projects that have been posted here by contextsensitivesolutions.org site members . To search for a particular project, enter a keyword or click on "Advanced Search."


     Projects      Case Studies

1 2 3 4 5 6 7 8 9 10 >
Sort by:    Sort Up Icon Title    Status    State   
Courtesy of DDOT

11th Street Bridges Project

Washington, DC (Started 2008-07-02)

The incomplete freeway system in Southeast Washington forces drivers to exit the freeway onto neighborhood streets to reach their destinations. Some of the primary routes are through environmental justice neighborhoods. Freeway and local street... more

The purpose of this project was to reconstruct a six-mile section of urban arterial to address capacity and safety issues, in addition to providing a stimulation to the local economy.

12300 South Design Build Project, Draper and Riverton, Utah

Draper, UT

The purpose of this project was to reconstruct a six-mile section of urban arterial to address capacity and safety issues, in addition to providing a stimulation to the local economy.

6th Street Undercrossing

Santa Rosa, CA (Completed 2012)

This project creates a vital crosstown link for pedestrians, bicyclists, and vehicles. On one side, it opens up into the West End Neighborhood, Railroad Square, the CHOPS Teen Center, the future SMART station, and miles of creek trails. On the... more

I-465 Concept Hierarchy

Accelerate I-465

Indianapolis, IN

For reasons of increasing capacity and improving safety, the I-465 project, titled “Accelerate 465,” consists of freeway reconstruction, upgrades of interchange ramps and mainline capabilities, improved geometrics and access upgrades to major... more

Access Management Plan: US Highway 10

Detroit Lakes, MN (Completed 2002)

The Access Management Plan for Highway 10 through Detroit Lakes was needed to improve safety and maintain mobility for through traffic while providing appropriate access to the local community.

This project is located in the City of... more

Viewed as the most maintained wall type, according to the AIMS study.

Aesthetic Initiative Measurement Systems (AIMS) - Phase I & Phase II

(Started 2006-06)

The goal of the project was to integrate consideration of highway landscape corridor public perceptions into DOT planning and decision-making by developing a method to engage DOT staff in a variety of design, engineering, and maintenance disciplines... more

WEC Group

A New Vision For West Eugene

Eugene, OR (Started 2009-02)

This planning effort was initiated on the heels of a failed major bypass project planned for 20 years, to relieve traffic congestion in Eugene, OR that left the community extremely polarized. The objectives of the West Eugene Collaborative can be... more

AR 215, Ozark National Forest, AR

AR 215, Ozark National Forest, AR

Purpose and Need: Inadequate roadway for current and anticipated traffic - travel lane too narrow, surface rough (gravel), and unnecessary amount of dust and siltation produced, detracting from the personal experience and water quality of the streams... more

Earning rave reviews from the City of Shoreline and the public, the project garnered formal recognition from the American Road & Transportation Builders Association (ARTBA) with its Globe Award, which honors U.S. transportation construction projects that demonstrate environmental excellence and stewardship and serve as role models for other projects.

Aurora Multimodal and Interurban Bridge Project

Shoreline, WA (Started 2007-06)

Community desires to improve the quality of life in the city; promote development; security; stormwater quality; aesthetics.

Austin Accessibility Assessment Improvement (AAAIM)

Austin, TX

Persons with disabilities have long voiced concerns about the lack of integrated access between Capital Metro's (CMTA) fixed-route bus stops and the City of Austin's transportation network, particularly the pedestrian infrastructure, a disconnect... more

Bell Street Model

Bell Street Park

Seattle, WA

A single-purpose right-of-way is being transformed into a vibrant, safe, and green public space. This 4-block section is the first phase of a long-range plan for a park corridor stretching from South Lake Union to Elliott Bay. When high land... more

The existing facility had a narrow roadway that posed safety issues and mobility issues due to limited passing opportunities on the winding, mountainous road.

Berthoud Pass Mountain Access Project - Phases 1 and 2

Clear Creek County, CO

The existing facility had a narrow roadway that posed safety issues and mobility issues due to limited passing opportunities on the winding, mountainous road. The existing roadway also posed numerous environmental problems due to: 1) poor... more

Big Bear Plan

Big Bear Bridge

Big Bear, CA

Time, heavy use and severe weather has critically affected the road and the dam beneath it. Seismic retrofitting of the dam will require the elimination of the existing road, which has two 10.5' lanes with 0' shoulders and a 3.5' sidewalk which... more

Blue Water Bridge Aesthetic Design Guide

Port Huron, MI

Billions of dollars of trade pass through crossings in Michigan to and from Canada each year. At the Blue Water Bridge crossing, increases in wait time and new improved security measures require a redesign of the plaza and highway approach in the... more

The goal of the project is to develop Bridgeport Way as a corridor that will improve traffic safety, increase the mobility and cohesiveness of the community, enhance the appearance of the corridor, and control traffic growth.

Bridgeport Way Reconstruction

University Place, WA

The purpose of this project was to address the safety concerns due to the high number of crashes over the past years. At the same time it was viewed essential to the vision statement of the City Council that aimed in improving the quality of life in... more

Bridge Retrofits, I-70 North

St. Louis, MO (Started 2001, Completed 2002)

MoDOT had recently completed 10 miles of urban I-70 interstate using a standard design palette that neighboring residents disliked. Particularly when compared to recent context sensitive solutions development and community input in the adjacent... more

Bruce R.Watkins Drive

Kansas City, MO (Completed 2001)

Bruce R. Watkins Drive, a Missouri Department of Transportation project, is a 10.2 mile-long artery, which links downtown Kansas City to Southtown. The design and construction of this project included aesthetic design with environmental... more

Burlington, Iowa: Revitalizing a Struggling Small Downtown

Burlington, IA (Started 1999, Completed 2006)

Burlington, Iowa, was a significant Midwestern river and rail transportation hub from the 1820s til the mid-twentieth century. Manufacturing remains an important component of the local economy, but sprawling suburban development has made it... more

California: Developing and implementing Corridor Master Plans (CMPs)

Two one-day workshops focusing on how CMPs can be used to implement CSS principles to solve transportation & community issues and the mechanics of their funding and implementation in Caltrans. Included a Caltrans project case study, interactive group... more

Central Texas Greenprint for Growth

Bastrop County, TX

Greenprint for Growth or "Greenprinting" uses TPL's unique application of Geographic Information System (GIS) mapping and modeling technology to help local governments and communities make informed land use decisions, guiding where growth and... more

1 2 3 4 5 6 7 8 9 10 >


Feedback, questions, comments, or problems?
email info@contextsensitivesolutions.org

Copyright © 2005 Context Sensitive Solutions.org. All rights reserved.
About Us | Site Map | Privacy Policy

United States Department of Transportation - logo
Privacy Policy | Freedom of Information Act (FOIA) | Accessibility | Web Policies & Notices | No Fear Act | Report Waste, Fraud and Abuse | U.S. DOT Home |
USA.gov | WhiteHouse.gov

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000