Sort by:    Sort Up Icon Title    Status    State   
Courtesy of DDOT

11th Street Bridges Project

Washington, DC (Started 2008-07-02)

The incomplete freeway system in Southeast Washington forces drivers to exit the freeway onto neighborhood streets to reach their destinations. Some of the primary routes are through environmental justice neighborhoods. Freeway and local street... more

The purpose of this project was to reconstruct a six-mile section of urban arterial to address capacity and safety issues, in addition to providing a stimulation to the local economy.

12300 South Design Build Project, Draper and Riverton, Utah

Draper, UT

The purpose of this project was to reconstruct a six-mile section of urban arterial to address capacity and safety issues, in addition to providing a stimulation to the local economy.

6th Street Undercrossing

Santa Rosa, CA (Completed 2012)

This project creates a vital crosstown link for pedestrians, bicyclists, and vehicles. On one side, it opens up into the West End Neighborhood, Railroad Square, the CHOPS Teen Center, the future SMART station, and miles of creek trails. On the... more

Abita Springs Roundabout

Abita Springs, LA (Started 2004-04-15, Completed 2008-03-03)

Congestion during peak hours due to the strange configuration of the intersection initiated this project.

Access Management Plan: US Highway 10

Detroit Lakes, MN (Completed 2002)

The Access Management Plan for Highway 10 through Detroit Lakes was needed to improve safety and maintain mobility for through traffic while providing appropriate access to the local community.

This project is located in the City of... more

WEC Group

A New Vision For West Eugene

Eugene, OR (Started 2009-02)

This planning effort was initiated on the heels of a failed major bypass project planned for 20 years, to relieve traffic congestion in Eugene, OR that left the community extremely polarized. The objectives of the West Eugene Collaborative can be... more

Earning rave reviews from the City of Shoreline and the public, the project garnered formal recognition from the American Road & Transportation Builders Association (ARTBA) with its Globe Award, which honors U.S. transportation construction projects that demonstrate environmental excellence and stewardship and serve as role models for other projects.

Aurora Multimodal and Interurban Bridge Project

Shoreline, WA (Started 2007-06)

Community desires to improve the quality of life in the city; promote development; security; stormwater quality; aesthetics.

The existing facility had a narrow roadway that posed safety issues and mobility issues due to limited passing opportunities on the winding, mountainous road.

Berthoud Pass Mountain Access Project - Phases 1 and 2

Clear Creek County, CO

The existing facility had a narrow roadway that posed safety issues and mobility issues due to limited passing opportunities on the winding, mountainous road. The existing roadway also posed numerous environmental problems due to: 1) poor... more

Big Bear Plan

Big Bear Bridge

Big Bear, CA

Time, heavy use and severe weather has critically affected the road and the dam beneath it. Seismic retrofitting of the dam will require the elimination of the existing road, which has two 10.5' lanes with 0' shoulders and a 3.5' sidewalk which... more

r1

Blue Ridge Road Grade-Separation Project

Raleigh, NC (Started 2011)

The proposed Blue Ridge Road grade-separation project in west Raleigh will lower the grade of Blue Ridge Road, carrying it under (currently intersecting) Hillsborough Street and Beryl Drive, as well as a busy at-grade railroad crossing between the... more

The goal of the project is to develop Bridgeport Way as a corridor that will improve traffic safety, increase the mobility and cohesiveness of the community, enhance the appearance of the corridor, and control traffic growth.

Bridgeport Way Reconstruction

University Place, WA

The purpose of this project was to address the safety concerns due to the high number of crashes over the past years. At the same time it was viewed essential to the vision statement of the City Council that aimed in improving the quality of life in... more

Coachella Valley Vista Point 3

Coachella Valley Vista Point

Coachella, CA (Completed 2011-06-30)

This project originally started due to a need to upgrade the existing site amenities of the existing vista point facility to comply with the Americans with Disabilities Act (ADA) and reduce maintenance expenditures. Caltrans maintenance identified... more

The purpose of this project was to address safety and capacity issues, with improved geometrics. Environmental and cultural enhancements were also included in the project.

Cody-Yellowstone Highway Project, Wyoming

Cody, WY

The purpose of this project was to address safety and capacity issues, with improved geometrics. Environmental and cultural enhancements were also included in the project.

"Context Sensitive Solutions: The Pillar of Sustainable Highways" - Parsons Brinckerhoff's (PB's) CSS Training for PB staff & clients (PB's) CSS Training for PB Staff & Clients

From October 2003 through the fall of 2007, PB sponsored seminars and presentations on the subject of Sustainable Highways: Oxymoron or Opportunity. More than 1650 transportation professionals participated in the 45 sessions that were held... more

The purpose of the project was to replace two existing functionally obsolete truss bridges crossing the Cooper River in Charleston Harbor.

Cooper River Bridge Replacement Project

Charleston Harbor, SC

The purpose of the project was to replace two existing functionally obsolete truss bridges crossing the Cooper River in Charleston Harbor. The new structure would need to 1) Increase the capacity of US 17 over the Cooper River, 2) Improved traffic... more

Corridor Management Plan: Minnesota Highway 38 Edge of the Wilderness National Scenic Byway

Grand Rapids, MN (Completed 1995)

The purpose of creating a Corridor Management Plan was to coordinate the philosophies and activities of land management agencies with those of the state and county authorities responsible for planning, designing, constructing, and maintaining a... more

Cunningham Avenue Imagery

Cunningham Avenue Beautification

Urbana, IL

The majority of the existing corridor was developed in the County and was later annexed in the City. This created areas of non-conformity with the City's zoning and subdivision ordinances and a significant number of curb cuts along Cunningham... more

Design for Reconstruction of US 93: Evaro to Polson, Montana

Evaro, MT

US 93 runs from Arizona to Canada. It is a two-lane road through much of Montana, entering big-sky country from Idaho at Lost Trail pass and passing through Missoula, Kalispell, the Flathead Indian Reservation, and along the western shore of Flathead... more

Through innovative and collaborative partnerships, 19 political jurisdictions have agreed to pursue a balanced transportation plan that encompasses highway, bus, rail transit, bike, pedestrian and local network projects

Eastern Corridor

Southwestern, OH

The Eastern Corridor Project was conducted to address the growing needs of the eastern Cincinnati metropolitan area by integrating multi-modal solutions, land use planning and environmental stewardship. Through innovative and collaborative... more

The $200 million plus project offers the third transit system alternative in the region that will give customers faster, frequent and first class service.

Euclid Corridor Transportation Project

Cleveland, OH

The Greater Cleveland Regional Transit Authority (GCRTA) is embarking upon a unique and exciting transit system improvement project. The $200 million plus project offers the third transit system alternative in the region that will give customers... more

1 2 3 4 5 >


Feedback, questions, comments, or problems?
email info@contextsensitivesolutions.org

Copyright © 2005 Context Sensitive Solutions.org. All rights reserved.
About Us | Site Map | Privacy Policy

United States Department of Transportation - logo
Privacy Policy | Freedom of Information Act (FOIA) | Accessibility | Web Policies & Notices | No Fear Act | Report Waste, Fraud and Abuse | U.S. DOT Home |
USA.gov | WhiteHouse.gov

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000